Case Studies
GE - Roper
Energy Savings Case Study
.jpg)
Subject Information | |
---|---|
Facility: | GE - Roper |
Facility Type: | Manufacturing - Appliances |
Facility Size: | 1,200,000 sq. ft. |
General Electric (GE) is an American multinational conglomerate corporation incorporated in Schenectady, New York and headquartered in Fairfield, Connecticut in the United States.
EIS performed a number of installation for GE facilities, including an installation located in GE's Roper stove manufacturing plant in North Georgia. The results to date have been outstanding, exceeding the promised savings level by almost 30%.
Savings Analysis | ||
---|---|---|
Projected | Actual | |
Monthly Savings | 10.1% | 21% |
Payback Period | 27 months | 11 months |
Technology Used | EISLiners, PowerLiners, Lighting Upgrades, EIS Optimizer, Elspec, Frigi‐Tech |
Lighting | 11.40% |
A/C | 4.80% |
Refrig | 3.20% |
Equipment | 75.60% |
Resistive | 5.00% |
Lighting | 2.10% |
A/C | 0.20% |
Refrig | 0.50% |
Equipment | 7.30% |
Resistive | 0.00% |
Annual Environmental Benefits
- 4,368,000 lbs CO2
- 1,625 barrels of oil
- 1,233 tons of coal
- 32,980 lbs of SO2
- Equivalent to removing 406 vehicles
Additional Benefits
- Motors run cooler
- Improved lighting quality
- Standardized lighting in the entire facility
- No special training or employee involvement
- Increased electrical capacity